2019 Carlson Road Dam/Culvert Replacement

Published on 7/27/2019

The bidders information for the project can be viewed and downloaded here.  Information includes the project specifications (256 pages) and the project drawings (10 pages).

The project was first advertised on July 25, 2019 and bids are scheduled to be opened on August 27, 2019.  The project is scheduled to be completed by November 02, 2019.


Sawyer County's permit from Wisconsin DNR was extended 1 year for this project due to unforeseen delays.

The new structure will be a rectangular concrete box culvert, 12-ft wide by 7-ft high.  The invert (bottom floor) of the culvert will be set at elevation 1343.60.Road closures are expected during working hours, 7 a.m. to 7 p.m. An emergency access plan wll be developed with the county and contractor.  Construction observation by be done by an engineering firm.